KIA Klarus
1.1. Periodicity of maintenance + 2. FE DOHC engines and Т8 DOHC + 3. Greasing system + 4. Cooling system + 5. Power supply system and release + 6. Fuel system + 7. Ignition system + 8. Coupling - 9. Mechanical transmission 9.1. Specifications 9.2. Check of level of oil 9.3. Oil replacement 9.4. Transmission removal 9.5. Transmission installation 9.6. General recommendations about transmission dismantling 9.7. Dismantling, check of a fifth / reverse gear and case 9.8. Dismantling of knots of a case of coupling and transmission case 9.9. Replacement of oil consolidation of differential on the car 9.10. Dismantling of primary shaft of a transmission 9.11. Dismantling of a secondary shaft of a transmission 9.12. Check of details of primary and secondary shaft 9.13. General recommendations about assembly 9.14. Assembly of a secondary shaft 9.15. Assembly of primary shaft 9.16. Assembly, check of a fifth / reverse gear and case 9.17. Choice of adjusting laying 9.18. Preliminary tightness of the bearing of differential 9.19. Adjustment of a preliminary tightness of the bearing 9.20. Remarks on transmission assembly 9.21. Differential 9.22. Gear shifting mechanism 9.23. Search and elimination of malfunctions + 10. АКП G4A–EL + 11. АКП 50–40 LE + 12. Axes and power shafts + 13. Steering + 14. Wheels and tires + 15. Suspension bracket + 16. Body + 17. Central air + 18. Electric equipment + 19. Brake system + 20. Electric circuits
|
Sequence of dismantling of a secondary shaft of a transmission
1–bearing; 2–a conducted gear wheel of the 4th transfer; 3–lock ring; 4–a conducted gear wheel of the 3rd transfer; 5–gear wheel of the 2nd transfer; 6–ring of the synchronizer of the 2nd transfer; 7–lock ring; 8–nave of the coupling 1 and 2nd of transfers assembled; 9–ring of the synchronizer of the 1st transfer; |
10-gear wheel of the 1st transfer; 11-bearing (end of a secondary shaft); 12-secondary shaft; 13-spring of a cracker of a clamp of the synchronizer; 14-nave of the coupling of the synchronizer of a backing; 15-cracker of a clamp of the synchronizer; 16-nave of the coupling of the synchronizer 1 and 2nd of transfers. |
Preliminary check
Axial gap of a gear wheel of the 1st transfer
PERFORMANCE ORDER |
|
1. Measure a gap between a gear wheel of the 1st transfer and a leading gear wheel of differential. Nominal gap: 0,05–0,28 mm
Maximum permissible gap: 0,33 mm
|
2. If the gap exceeds maximum permissible value, check a surface of contact of a gear wheel of the 1st transfer conducting gear wheels of differential and a nave of the coupling of the synchronizer 1-ой/2nd transfers. Replace the worn-out or damaged details.
|
|
Axial gap of a gear wheel of the 2nd transfer
PERFORMANCE ORDER |
|
1. Measure a gap between a gear wheel of the 2nd transfer and a conducted gear wheel of the 3rd transfer. Nominal gap: 0,18–0,46 mm
Maximum permissible gap: 0,51 mm
|
2. If the gap exceeds maximum permissible value, check a surface of contact of a gear wheel of the 2nd transfer, a conducted gear wheel of the 3rd transfer and a nave of the coupling of the synchronizer 1-ой/of the 2nd of transfers. Replace the worn-out or damaged details.
|
|
Dismantling
PERFORMANCE ORDER |
Disassemble a secondary shaft in the sequence given on drawing. |
|
The bearing and conducted gear wheel of the 4th transfer
PERFORMANCE ORDER |
|
By means of the special adaptation ОК130 175 008 remove the bearing and a conducted gear wheel of the 4th transfer. |
|
|
Conducted gear wheel of the 3rd transfer and gear wheel of the 2nd transfer
PERFORMANCE ORDER |
1. Remove a lock ring. |
2. Include the 1st transfer. |
|
3. By means of the special adaptation ОК130 175 008 remove a conducted gear wheel of the 3rd transfer and a gear wheel of the 2nd transfer. |
|
|
Nave of the coupling 1 and 2nd of transfers assembled, ring of the synchronizer of the 1st transfer and gear wheel of the 1st transfer
PERFORMANCE ORDER |
1. Remove a lock ring. |
|
2. By means of a press remove a nave of the coupling 1 and 2nd of transfers assembled, a ring of the synchronizer of the 1st transfer and a gear wheel of the 1st transfer. |
|
|
Bearing (end of a secondary shaft)
PERFORMANCE ORDER |
|
By means of special AA0 adaptations ОК201 172 and OK 930 175 AA0 remove the bearing. |
|
|
|
|